Bombardier Aerospace

Client: Bombardier Aerospace, Hanger 11 Site Development
Location: North York, Toronto
Date: 2013

Project Highlights:

Excavation and grading including storm water management pond, foundation & pit excavation, cast in place concrete underground water storage tank with volume 600mm dia. HDPE DR17 storm force main including trench less installation, 150mm dia.HDPE DR17 sanitary force main including pumping station, asphalt paving of roads and parking areas including granular, various diameter concrete storm sewer including structures.

The King Road Shuffle

Client: City of Burlington/Canadian National Railways
Location: King road
Date: October 5-8, 2012 Thanksgiving

Project Highlights:

Suspending trail traffic for an 84 hour period in order to install a pre-constructed 3 track bridge structure. 8400 m3 of excavation was completed within a 24 hour scheduled period. A crew of 45 personnel and 30 pieces of equipment supported and supplemented CN forces over the balance of the duration of the 84 hour period. The 2500 te structure was jacked into place and ancillary works completed within the 84 hour scheduled window, allowing rail traffic to open as scheduled.

Remove the rail track, excavate approximately 8,000 cubic metres (10,464 cubic yards), and build the concrete pads for the underpass bridge to slide into place as well as back-fill.

Start time was 11:59 Friday night, and it all had to be finished by 11:59 Monday night in order to handle the first roar of the early trains. The result was a very intensive 72 hours.

Consultant: Hatch Mott MacDonald

Toronto Premium Outlet

Client: Calloway Real Investment Trust, PCL
Location: Trafalgar and Steeles Road
Date Completed:  2012 – 2013

Project Highlights:

Over 40 acres commercial site development; excavation, site services, construction of storm water management facilities.

Halton Regional Hospital

Client: EllisDon
Location: Dundas St. West, Oakville ON
Date: 2011

Project Highlights:

Excavation/Grading includes foundation and pit excavation on shale and clay, Cut, fill & compact for site grading sub-grade preparation, back-fill structures with clay, back-fill structure with sand /granular “B”, supply and place 19mm clear limestone under slab on grade, spread topsoil to landscaped areas.

Earl Bales Park

Client: City of Toronto
Location: Bathurst st.
Date: July 2010 – October 2011

Project Highlights:

Construction of Storm Water Management Facilities includes bulk excavation & grading pond for golf course, construction of roadways/pathways/forebays with associated features, forcemain installation including pumping station 300/250 dia HDPER DR11, water diversion channel re-alignment, in-water/tree/shrub planting other landscape restoration.

Consultant: MMM Group

Enhancement of Windermere Basin

Client: City of Hamilton
Location: Hamilton
Date: Started on May 2010 and completed on 2013

Project Highlights:

A marine project that consist on conversion of Windermere Basin into a large coastal wetland with a footprint area of 11 hectares.

Consultant: Cole Engineering Group Ltd.

Mayfield Road

Client: Region of Peel
Location: Inder heights to heart lake road
Date: 2010

Project Highlights:

Underground services including earth/peat excavation, storm water management pond, sheet piling, CPP water mains, sanitary and storm sewers.

Consultant: Stantec Consulting Ltd.

Clonmore Retaining Wall

Client: CN Rail
Location: Scarborough GO and Union Station
Date Completed: March 2008

Project Highlights:

Construct 250 meter long x 4.5 meter high “H” pile, MESA pre-cast concrete retaining wall 150 meter long x 3 meter high retaining wall for new third mainline track between Scarborough Go and Union Station. Includes design and build a temporary 120 meter long sheet pile retaining wall to support construction of the permanent work.

Consultant: UMA AECOM