Pearson Airport – Bombardier

Client: Bombardier Aerospace

Location: Toronto, ON

Role: Subcontractor to the Construction Manager

Contract Type: Design-Bid-Build

This project was part of the construction of the Bombardier Global Manufacturing Center. This state-of-the-art facility provided a new home to the Global Manufacturing Center, previously located in nearby Downsview, ON.

Specific construction activities carried out by Metric include:

Airport security fencing: 1,000 m  

Topsoil strip and remove offsite (~300mm): 170,000 m2  

Excavation and remove offsite: 150,000 m3  

Treat and remove contaminated material: 15,000 m3  

Cast-in-place concrete water tanks x4 (by storage volume): 16,000 m3  

Storm Sewer: 3,300 m  

Sanitary Sewer: 1,700 m  

Watermain: 2,900 m  

Retaining Walls x3 (by length): 470 m  

Excavation for Building Foundations x2 (by building area): 55,000 m2                                        

Stone for Slab on Grade: 30,000 T  

Paving: 110,000 m2  

Landscape / Hardscape: 13,000 m2  

Supply and installation 2.5mx2.5m Aircraft Loading Box Culvert including Manholes: 140 LM