Client: 407 East Construction General Partnership
Location: Brock Road to Highway 35/115 and two north-south links connecting Highway 401
Highway 407 East was built in two phases. Phase 1 included the mainline from Brock Road in Pickering to Harmony Road in Oshawa and the West Durham Link in Whitby. Phase 2 included the mainline from Harmony Road in Oshawa to 35/115 in Clarington and the East Durham Link in Clarington.
Over the two year duration of the project our crews moved over 6 million cubic meters of earth







