Bombardier

Bombardier Aerospace

Client: Bombardier Aerospace, Hanger 11 Site Development
Location: North York, Toronto
Date: 2013

Project Highlights:

Excavation and grading including storm water management pond, foundation & pit excavation, cast in place concrete underground water storage tank with volume 600mm dia. HDPE DR17 storm force main including trench less installation, 150mm dia.HDPE DR17 sanitary force main including pumping station, asphalt paving of roads and parking areas including granular, various diameter concrete storm sewer including structures.