CN Clonmore Wall

Clonmore Retaining Wall

Client: CN Rail
Location: Scarborough GO and Union Station
Date Completed: March 2008

Project Highlights:

Construct 250 meter long x 4.5 meter high “H” pile, MESA pre-cast concrete retaining wall 150 meter long x 3 meter high retaining wall for new third mainline track between Scarborough Go and Union Station. Includes design and build a temporary 120 meter long sheet pile retaining wall to support construction of the permanent work.

Consultant: UMA AECOM