407 EastX

Highway 407 East Extension

Client: 407 East Construction General Partnership
Location: Brock Road to Highway 35/115 and two north-south links connecting Highway 401.
Date: October 2013

Project Highlights:

Highway 407 East will be built in two phases. Phase 1 includes the mainline from Brock Road in Pickering to Harmony Road in Oshawa and the West Durham Link in Whitby. Phase 2 includes the mainline from Harmony Road in Oshawa to 35/115 in Clarington and the East Durham Link in Clarington.

Earth excavation, moving, grading and drainage works includes stripping, cut to fill, and haul short and long distance, placing top soil from the site, seeding, mulching and erosion control.